image
 
PT.MALMASS MITRA TEKNIK PROJECT
GEDUNG MENTERI & GEDUNG PARKIR KEMENTRIAN PEKERJAAN UMUM

Location: Jalan Pattimura No.20, South Jakarta

PROJECT DATA:
Owner: Departemen Pekerjaan Umum Republik Indonesia
Architect: PT. Jakarta Konsultindo
Site Area: ± 24.000 m²
Building Area: 25.000 m²
Total Building: 1 Tower (Office & Parking)
Total Floor : 17 Storey + 12 Parking
Function Building: Office & Parking
Year: 2010

MEP SYSTEM:
ACMV System: Central Chiller Water Cooled & Mechanical Ventilation

Plumbing System:
- Clean Water, Waste Water & Recycling
- STP 120 m³ & Recycling, GWT 400 m³
- Top Reservoir 50 m³ & 10 m³

Fire Fighting System:
- Fire Hydrant, Sprinkler System & Fire Extinguisher
- Electric Hydrant Pump (EHP) 1.000 us gpm, head 150 m’
- Electrical Characteristic; 380 Volt, 3 Ph, 50 Hz
Lift/Elevator: 7 Unit Lift Passengers & 1 Unit Lift Service

Electrical System:
- Electrical Load PLN 2.425 kVA TM
- Transformer 2 x 1600 kVA, 20 kV – 380 Volt
- Diesel 2 x 1.200 kVA, Synchronized, Prime Power

Lightning System: Non Conventional, Early Streamer Emission - Electrostatic type
Telecommunication System: PABX – 70/700 Ext. Expandable up to 10.000 Ext.
Fire Alarm System: Semi Addressable System, 4 Loops – 900 points
Sound System: Back Ground Music (BGM), Public Address and Evacuation
Security System: CCTV System
Ancillary: Building Automation System (BAS)