image
PT.MALMASS MITRA TEKNIK PROJECT

TITANIUM SQUARE

Location : Jl. Pasar Rebo, Jakarta Timur

Project Data :
Owner : PT. Titanium Property
Architect : PT. Matahari Grha Istana
Site Area : 19.592 m²
Building Area : 56.402 m²
Total Building : 3 Tower
Total Floor :  17 Floor
Function Building : Anami, Mall & Aston Hotel
Year : 2012

MEP System :
ACMV System : Central Air Cooled Chiller System

Plumbing System :
- Clean Water,Waste Water, Vent and Rain Water. Etc
- Ground Water Tank (GWT) cap. 640 m3 (Source, PDAM and Deep Well)
- Top Reservoir cap. 70 m3 @ 2 unit, 140 m3 @ 1 unit
- STP 1 : cap.200 m3/day, Aeration System
- STP 2 : cap. 200 m3/day

Fire Fighting System :
- Fire Hydrant, Sprinkler System and Fire Extinguisher
- Electric Hydrant Pump (EHP) 1.000 us gpm, head 130 m’
- Electrical Characteristic : 380 Volt, 3 Ph, 50 Hz.
- Lift / Elevator : 4 unit Passengers Lift, 1 unit Lift service

Electrical System :
- Electrical Load : PLN 3.000 kVA (Source : PLN & Genset)
- Transformers Oil type : 1 x 1.600 kVA, 1 x 1.250 kVA, 1 x 1.000 kVA, 20 kV -380 Volt
- Diesel Generator Set, 1 x 500 kVA, 1 x 700 kVA, 1 x 1.250 kVA Synchronized, Prime Power.

Lightning System : Non Conventional, Early Streamer Emission – Electrostatic type.
Telecommunication System : PABX-1000 line outlets/ 100 point
Sound System : Public Address/ paging dan Back Ground Music (BGM) dan Car Call address capacity
Security System : CCTV System