PT.MALMASS MITRA TEKNIK PROJECT

APARTEMEN STUDENT CASTLE

Project Data : Owner : PT.

Architect : PT.
Site Area : m2
Building Area : 27.709 m2
Total Building :
Total Floor : 10 lantai + 2 basement
Function Building : Apartemen
Year : 2013

MEP System :
ACMV System : Split Wall Mounted
Plumbing System :
- Clean Water,Waste Water, Ventilation and Rain Water. Etc
- Ground Water Tank (GWT) cap. 170 m3 (Source, PDAM and Deep Well)
- Top Reservoir cap. 20 m3
- STP cap. 65 m3/day, Extended System

Fire Fighting System
- Fire Hydrant, Sprinkler System and Fire Extinguisher
- Electric Hydrant Pump (EHP) 750 us gpm, head 30 m'
- Electrical Characteristic : 380 Volt, 3 Ph, 50 Hz.
- Lift / Elevator : 1 unit Passengers Lift, 1 unit service lift

Electrical System :
- Electrical Load : PLN 415 kVA (Source : PLN & Genset)
- Transformers Oil type : 1 x 630 kVA, 20 kV , 380 Volt
- Diesel Generator Set, 1 x 500 kVA Prime Power.

Lightning System : Non Conventional, Early Streamer Emission , Electrostatic type.
Telecommunication System : PABX 15/150 ext, 20 trunk lines
Fire Alarm System : Semi Addressable System
Sound System : Public Address/ paging dan Back Ground Music (BGM) dan Car Call
Security System : CCTV System