PT.MALMASS MITRA TEKNIK PROJECT

NIRVANA APARTMENT

Location: Kemang – South Jakarta

PROJECT DATA:
Owner: PT. CIPTA LINTAS KEMANG
Building Area: ± 15.000 m²
Total Building: 1 Tower.
Total Floor: 17 Storey
Function Building: Apartment
Year: 2009

MEP SYSTEM:
ACMV System: AC Split Wall Mounted and Mechanical Ventilation system

Plumbing System:
- Clean water, Waste water, Ventilation and Rain Water, etc
- GWT cap.200 m³ , Top Reservoir cap.30 m³
- STP cap.60 m³/day, Aeration system

Fire Fighting System:
- Hydrant and Sprinkler system
- Electric Hydrant Pump (EHP) cap.1.000 us gpm, head 150 m’
- Electrical Characteristicts; 380 Volt, 3 Ph, 50 Hz

Lift/Elevator System:
- 4 Unit Lift Passengers, 9 persons/1000kg, 90 mpm
- 1 Unit Lift Service, 1000kg, 60 mpm

Electrical System:
- Electrical Load; PLN 1.730 kVA (Source; PLN & Genset)
- Transformers Oil type, 1 x 1.600 kVA, TM 20 kV - 380 Volt,
- Diesel Generator Set, 2 x 850 kVA Synchronized, Prime power type

Lightning System: Conventional system
Telecommunication System: PABX, 400 Direct Lines – 800 Extention, to PT.Telkom
Fire Alarm System: Semi Addressable System, 6 Loops – 1.350 points
Sound System: Public Address and Evacuation System
Security System: CCTV System